What broke
Three missions reported the workflow document stale, each reported correctly, none was in scope to fix it, and two were deferred to its own lot by the same seat.
The rule it paid for
A lot that changes the launcher, the conditions, the form or the gates updates the workflow document in the same lot; naming the fault is the floor, not the discharge.